Physical Risk Needs Context
A physical control weakness does not have the same significance everywhere. APCAF evaluates findings against Asset Criticality, Physical Exposure, and Consequence, enabling deterministic risk scoring and defensible treatment decisions without rigid checklist mandates.
Evaluating Physical Exposure & Impact
Three independent, observable physical parameters derive the calculated risk priority.
Asset Criticality (AC)
The operational, financial, or data value of the protected zone.
Physical Exposure (PE)
The accessibility and boundary layers surrounding the control.
Consequence (C)
The direct impact if the physical control is successfully defeated.
Deterministic Risk Scoring Calculator
Test combinations of Asset Criticality, Physical Exposure, Consequence, and Organizational Risk Appetite.
Calculated risk exceeds organizational appetite. Mandatory physical hardware correction required.
Three Canonical Ground-Truth Scenarios
Identical physical hardware observation (5 mm frame gap on PHY-T1002) producing three distinct, defensible outcomes based on asset context.
Calculation: 1 × 3 × 1 = 3 (LOW).
Appetite: Organization tolerates Medium. Exceeds appetite:
false.
Calculation: 3 × 2 × 3 = 18 (MEDIUM).
Appetite: Organization specifies Low. Exceeds appetite:
true.
Calculation: 4 × 2 × 4 = 32 (HIGH).
Appetite: Organization specifies Low. Exceeds appetite:
true.
The 4 Risk Treatment Options
Formalized paths for risk disposition, accountability, and compensating control validation.
REMEDIATE
Direct physical hardware correction to satisfy the APCAF mitigation specification (`PHY-MXXXX`).
- Primary path for high/critical findings exceeding risk appetite.
- Expected residual risk: LOW.
- Integrates with APCAF-WF-01 vendor warranty punch lists.
COMPENSATE
Deploy a validated secondary control when primary physical remediation is structurally impossible.
- Anti-Checklist Rule: CCTV does not magically compensate for a latch gap.
- Must provide direct, verified barrier or immediate tamper detection.
- Requires documented effectiveness validation.
ACCEPT
Designated business risk owner accepts the residual risk within documented organizational appetite.
- APCAF records the decision; the organization owns the acceptance.
- Mandatory named Risk Owner and technical rationale.
- Mandatory annual review / expiration date (≤ 365 days).
AVOID / REMOVE
Eliminate the physical threat surface entirely by decommissioning or re-architecting the asset.
- Decommission unassigned network wall drops.
- Relocate sensitive servers to higher-security enclaves.
- Permanently wall off redundant external pedestrian portals.
Ready to run a field assessment with risk context?
The APCAF Field Workbench includes the live deterministic risk engine, telemetry logging, and YAML export.